1. G. De Sensi, F. Longo, G. Mirabelli, Inventory policies analysis under demand patterns and lead times constraints in a real supply chain, INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 99999:1, 1 – 20, doi: 10.1080/00207540701528776 
  2. F. Longo, G. Mirabelli, An Advanced Supply Chain Management Tool Based on Modeling & Simulation, Computer and Industrial Engineering, (2007), doi:10.1016/j.cie.2007.09.008 
  3. A.G. Bruzzone, E. Bocca, F. Longo, M. Massei, Logistics Node Design and Control over the Whole Life Cycle based on Web Based Simulation, INTERNATIONAL JOURNAL OF INTERNET MANUFACTURING AND SERVICES, Vol. I, Issue 1,pp. 32-50, 2007 
  4. F. Longo, G. Mirabelli Effective Design of an Assembly Line using Modeling & Simulation, INTERNATIONAL JOURNAL OF SIMULATION, Vol. XX, issue xx, xxxx (in progress) 
  5. G. De Sensi, F. Longo, G. Mirabelli, Modeling & Simulation Based Approach for Optimizing Seal Press Workstation in a Manufacturing System, Proceedings of Business and Industry Symposium, 25 – 29 Marzo 2007 
  6. D. Curcio, F. Longo, G. Mirabelli, E. Papoff, Pharmaceutical Routes Optimization using Artificial Intelligence, Proceedings of Intelligent Data Acquisition and Advanced Computing Systems: Technology and Applications, 6-8 Settembre 2007, Dortmund, Germany 
  7. D. Curcio, F. Longo, G. Mirabelli, Manufacturing Process Management Using A Flexible Modeling & Simulation Approach. Proceedings of Winter Simulation Conference, 9-12 December 2007, Washington D.C., USA 
  8. D. Curcio, F. Longo, G. Mirabelli, E. Papoff, Analysis of Security Issues in Airport Terminals using Modeling & Simulation , Proceedings of European Conference on Modeling and Simulation, 4-6 Giugno 2007, Praga, Repubblica Ceca 
  9. D. Curcio, F. Longo, G, Mirabelli Airport Terminal Management Using Web-Based Simulation. Proceedings of EuroSiw 2007, June 18-20, Genoa, Italy 
  10. M. Brandolini, F. Longo, Critical Issues And Potentials Of Scorm & Hla Integration For Supporting Training Simulation Interoperability. Proceedings of EuroSiw 2007, June 18-20, Genoa, Italy 
  11. G. De Sensi, F. Longo. G. Mirabelli, Ergonomic work methods optimization in a three dimensional environment, Proceedings of Summer Computer Simulation Conference, July 15-18, San Diego, California, USA 
  12. G. De Sensi, F. Longo, G. Mirabelli, Modeling & Simulation for workplaces analysis in the leather industry. Proceedings of 19th European Modeling & Simulation Symposium, October 04th – 06nd 2007, Bergeggi, Italy 
  13. F. Longo, Students training: integrated models for simulating a container terminal. Proceedings of 19th European Modeling & Simulation Symposium, October 04th – 06nd 2007, Bergeggi, Italy 
  14. D. Curcio, F. Longo, G. Mirabelli. Inventory policies comparis0n in a manufacturing plant by using Modeling and Simulation. Proceedings of 19th European Modeling & Simulation Symposium, October 04th – 06nd 2007, Bergeggi, Italy 
  15. F. Longo, A. Manica, A. Ritorto, Plant Lay-out design and Optimization Through Times and Ergonomics Re-organization, Proceedings of the International Cultural and Academic Meeting of Engineering Students, May 12th – 19th 2007, Instanbul, Turkey (Technical Paper) 
  16. G. Mirabelli, Time and Ergonomic analysis in a hand-craftefd manufacturing process, Proceedings of 19th European Modeling & Simulation Symposium, October 04th – 06nd 2007, Bergeggi, Italy
2007

Leave a Reply

Your email address will not be published. Required fields are marked *

Scroll to top