Plotter

(Plant Lay-out Analysis and Optimization Through Times and Ergonomic Re-Organization)

 

)

The project presents the results of a research work regarding the effective design of an assembly line for heaters production. Considering that the real plant still doesn’t exist, simulation has been used as cognitive tool. After the modeling and the VV&A phases the simulation has been used for  optimizing each assembly line workstation, carrying out time and ergonomic analyses.

Tel.: +39 0984 494891

Fax: +39 0984 494673

E-mail: info@msc-les.org

Information

Industrial Engineering Section

Unical ING/IND 17

Mechanical Department, University of Calabria,

Cubo 44 C, Third Floor,

87036, Rende (CS) Italy